Lighthouse has a new layout. Prefer the old one? Return to the old layout, and switch back any time from the link at the top of each page.

Create psi2 parser

#154

Reported by Andor Salga · June 30th, 2011 @ 07:52 PM

State: checked-in
Milestone: 0.75
Assigned to: Andor Salga Andor Salga

Activity

  1. Andor Salga
    Andor Salga
    • Milestone changed from 0.8 to 0.75
    • Milestone order changed from 18 to 0

    July 5th, 2011 @ 06:49 PM

  2. Andor Salga
    Andor Salga
    • State changed from assigned to staged
    • Milestone order changed from 20 to 0

    Branch: https://github.com/asalga/XB-PointStream/tree/bug154
    Tests added to ref tester.

    July 11th, 2011 @ 09:57 PM

  3. Andor Salga
    Andor Salga
    • State changed from staged to checked-in

    July 21st, 2011 @ 10:20 PM

Please Sign in or create a free account to add a new ticket.

With your very own profile, you can contribute to projects, track your activity, watch tickets, receive and update tickets through your email and much more.